CSLB #1130134 · Licensed & Insured (415) 770-4977

Licensed California general contractor · CSLB #1130134

Bathroom Remodeling in Sacramento & the San Francisco Bay Area

A licensed general contractor, a fixed written price before anything is demolished, and a schedule you can hold us to. Most bathrooms are finished in two to four weeks.

A written price for your exact bathroom, free. Send a few photos or book a quick visit — we look at the real condition first, then put a fixed, itemised price in writing.

  • A written fixed price before demolition starts — not an hourly guess
  • Permits pulled and inspections scheduled by us, not by you
  • Schluter KERDI bonded waterproofing on every shower, photographed before tile
  • One lead carpenter who is on your job from demolition to punch list

5.0★ from 9 Google reviews 5.0★ from 6 Yelp reviews Licensed, bonded & insured

Free · no obligation · about a minute

Get your free estimate

What's the project?
Photos of your project area (optional) — up to 5 photos

We reply the same business day, usually within a few hours during working hours. By sending this you agree we may contact you about your project.

How we price your bathroom

No guesses from a price list. Every bathroom is different underneath, so we look before we quote — and the number we give you is the number you pay.

  1. Send photos or book a visit. A few pictures from your phone are often enough; otherwise we come by, free, for about an hour.
  2. We check what matters. Condition behind the surfaces, plumbing and electrical, access, permits — the things that actually move the cost.
  3. You get a fixed, itemised price in writing. Free, no obligation, and it does not change after you sign unless you change the scope.

Get my free estimate

The three things that decide whether it goes well

Waterproofing is where bathrooms fail

Almost every bathroom we are called back to fix by another contractor failed at the shower pan or the curb, not at the tile. We use a bonded sheet membrane, flood-test the pan, and send you the photographs before a single tile goes on. If a future owner ever asks, the evidence exists.

The wall always has something in it

On houses built before roughly 1978 we plan for cast-iron waste, galvanised supply and the occasional bit of knob-and-tube behind the vanity wall. Those are priced as named allowances in your contract rather than discovered mid-job and billed as a change order.

Ventilation is code, not an upgrade

California Energy Code sets the exhaust requirement by room size, and a bathroom vented into an attic instead of outside will grow mould regardless of how good the tile is. We size the fan to the room and terminate it through the roof or wall.

Real Project

Drag to See the Difference

One bathroom in Sacramento, CA — our own photographs, not a supplier's catalogue. Drag the handle, or use the arrow keys.

Finished walk-in shower with large-format porcelain tile, a recessed niche and a bench, Sacramento, CA After
The same bathroom before work started: a dated tub and shower with small white tile and stained grout Before
Tub alcove to walk-in shower Full bathroom remodel · Sacramento, CA
The same bathroom stripped to the studs, showing the old plumbing and the damaged framing before waterproofing During

The part you never see again

Stripped to the studs, re-plumbed, waterproofed, then tiled in large-format porcelain with a hex mosaic floor, a recessed niche and a bench.

The middle photograph is the one that matters. Once tile goes on, nobody can check whether the framing was sound, the pipes were replaced or the waterproofing was done properly — which is exactly why a bathroom that was tiled over bad work starts failing in a couple of years.

Walkthrough

A Finished Bathroom, Up Close

Photographs flatten finish work. This is one of our recent bathrooms on video, so you can see how the tile lines up and how the details meet.

  • Large-format wave-textured wall tile
  • Brushed-gold rainfall head, handheld shower and wall controls
  • A linear drain along the wall and a speckled tile floor
  • A glass-topped pony wall with built-in niches
  • A double floating vanity with gold-framed mirrors and a light bar
  • Brushed-gold towel bars and a one-piece toilet

What California law already entitles you to

Most of these are rights you have with any contractor. We are listing them because a contractor who is uncomfortable with them is telling you something.

Your deposit is capped by statute

For a home improvement contract, a deposit may not exceed $1,000 or 10% of the contract price, whichever is less — Business & Professions Code §7159.5. Anyone asking for a third up front is breaking the law, not driving a hard bargain.

The licence is public — check ours

Any work over $500 requires an active CSLB licence. Ours is #1130134, and you can verify it, our bond and our workers' compensation on the state's own site: CSLB licence lookup.

You get it in writing before work starts

A home improvement contract must be in writing, with the scope, the price and a payment schedule tied to work completed, before any work begins. That is how we write every job anyway.

Three days to change your mind

You have a three-business-day right to cancel a home improvement contract signed at your home, and longer if you are 65 or over. We will remind you of it rather than hope you forget.

Questions we get asked before signing

How long does a bathroom remodel take?

A secondary bathroom is usually two to three weeks on site; a primary bathroom with a custom shower runs three to four. Add one to two weeks before start for permit issue and for tile and fixtures to arrive. We give you the dated schedule with the contract, not after it.

Do I need a permit to remodel a bathroom?

If you are only replacing a vanity, a toilet or the tile in the same position, generally no. The moment plumbing moves, a wall changes, or electrical circuits are added, yes — and in most of our cities that is a plan-check submittal. We pull it and we meet the inspector.

Can I use the bathroom during the work?

Not the one being remodelled. If it is the only bathroom in the house, say so at the estimate: we sequence those jobs differently and compress the fixture-out window to the shortest it can safely be.

How much deposit do you take?

By California law a home improvement contract deposit cannot exceed $1,000 or 10% of the contract price, whichever is less. We do not ask for more than that, and everything after it is tied to work actually completed.

What if you find something behind the wall?

Named allowances in the contract cover the common finds. Anything genuinely unforeseen is priced in writing and signed before we touch it. You will not receive a surprise invoice at the end.

Ready for a real number?

We will look at your bathroom, tell you what it needs, and put a fixed price in writing. The visit and the estimate are free, and there is no obligation at the end of them.

IronNest Construction · CSLB #1130134 · 2180 Harvard St STE 147, Sacramento, CA 95815 · Serving Sacramento and the San Francisco Bay Area